From: route@monster.com
Sent: Thursday, April 07, 2016 11:54 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
G. Eric Ostrom 2809 Dove Drive - York, Pennsylvania 17404 -
717-792-9815 summary Highly skilled, progressive, self-starting
individual with over twenty years of experience in planning, developing
schedules, monitoring and controlling new design / procure / construction air
quality control and retrofit / rehabilitation projects for fossil,
independent power producers and numerous hydro plants. Experienced in project
controls, project management, manufacturing operations and materials
management. Experienced user and implementation leader of Primavera Project
Planner P3, P3e and Primavera P6.8.0 Also experienced user of various
Microsoft-based packages. Has experience with SAP. Works well with others in
a team environment. experience Voith Hydro – York, Pennsylvania August 2012 to July 2015 Functional Master Scheduler Provided
achievable plans for Engineering to follow and execute on time. Responsible
to develop and maintain the resource table, assigning resources to
Engineering activities in the Master Schedule. Provided Engineering
Leadership with current Resource loading plans. Maintained KPI’s for
Engineering and assisted Engineering in the significant reduction of their
past due KPI’s. Participated Shop Floor Meetings for Engineering which lead
to open communication across all Engineering disciplines and downstream
functions which improved Project execution. WorleyParsons - Reading, Pennsylvania
July 2005 to June 2012 Sr. Project Controls Specialist Responsible for the
planning, monitoring, and controlling of multi-unit Flue Gas Desulphurization
engineering, procurement and construction projects, as well as new Coal Fired
Power Generating Units. voith Siemens hydro power.
(formerly
Allis-Chalmers) - York, Pennsylvania1977 to July 2005 Master Scheduler
1996
– July 2005 Leader
in the development of a process to automatically harvest salary labor hours
and off-load the Master Schedule, eliminating the need to manually off-load
the Master Schedule. Supported
Outage Managers by providing revised and updated outage schedules, which
maximized their time available for Outage Management. Leader
in the installation and conversion of SAP R/3 schedules to Primavera P3 and
P3e scheduling software. Lead conversion of a legacy manufacturing schedule
to Primavera P3 3.0. Master
schedule all phases of complex projects which led to a complete overview of
all projects. Coordinate
Engineering Management’s efforts to capacity manage and level load
Engineering Teams. Facilitate
Manufacturing planning for critical path projects which resulted in obtaining
on time Customer Deliveries. Production / Capacity Planner 1988-1996 Plan
and manage material delivery, Manufacturing and Engineering schedules to
support Customer Schedules which led to achieving the goal on 100% on time
shipments. Develop project shipping plan to optimize
consolidation of components resulting in meeting Customer requirements and
minimizing transportation costs. Level load critical work centers which led to fully
utilized critical work centers and a smoother workflow. Evaluate average
direct hours per employee and track direct vs. indirect hours yielding data
for process improvement goals. Material Analyst 1987-1988 Develop, manage and convert manual system to an
on-line customized MRP system. Implement cycle counting and eliminate yearly
physical inventory. Manufacturing Experience 1977-1987 Over 10 years experience in a heavy metal
fabrication, specific concentration in machining, assembly and testing. Journeyman
Machinist with CNC machine training and the capability to create CNC
programs. Training and Mentoring SAP Specific: -Developed
training manual/users guide. -Provide training and support to end users. General -Provided
training and assistance to individuals in the materials organization,
including PC usage and software. -Assisted in the ongoing Mentoring
program for York College Operations Management Course. Education/Certification Penn State/Voith Siemens Project Management
Certification2004-2005 Penn State - York, Pa Intro to Project Management2000 Primavera Project Planner for the Enterprise
(P3e) 1999 SAP Training Trained in specific
modules of SAP R/3 software1996-1997 APICS Courses JIT (Just In Time), Capacity Management
and “Train the Trainer” 1991-1995 Penn State - York, Pa. Principles of Inventory and
Material Management1988 Penn State - York, Pa. Mechanical Engineering
Technology1983-1984 ICS and Employer8000 Hour Machinist Apprenticeship1978-1983 GraduateSpring Grove Area High School - Spring Grove,
Pa. 1976 Software
Capabilities: Proficient in Primavera P3, Primavera P3e,
Primavera SureTrak, MS Projects, Excel, Word. Working knowledge of Powerpoint
and Access, SAP R/3 Project System, SAP R/3 Production Planning. Professional Membership APICS (American Production and inventory control
society) –Former Member PMI (Project Management Institute) – Former Member References Furnished Upon Request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|